toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

On-Vehicle Inspection|Page 2899 > < On-Vehicle Inspection|Page 2897
Page 3
background image

^

Maintain engine speed at 2,500 rpm or more.

^

Plug the Vacuum Transmitting Valve (VTV) hole with your finger.

^

Release the throttle valve.

^

Check the Dash Pot is set.

Dash Pot setting speed: 2,000 ( ± 200) rpm 

^

If not as specified, adjust with the Dash Pot adjusting screw.

5. Check operation of VTV

^

Set the Dash Pot setting speed as shown in steps above.

^

Remove your finger from the hole and check that the engine returns to idle speed in approx. 1 second.

On-Vehicle Inspection|Page 2899 > < On-Vehicle Inspection|Page 2897