T100 Regular Cab Pickup 2WD V6-3.4L (5VZ-FE) (1997)
5. A/T:
TORQUE 2 CONTROL SHAFT ASSEMBLY MOUNTING BOLTS
Torque: 29 N.m (300 kgf.cm, 22 ft.Ibf)
6. A/T:
CONNECT PARKING LOCK CABLE
7. INSTALL SPIRAL CABLE
8. INSTALL COMBINATION SWITCH WITH SPIRAL CABLE
(a) Install the 4 screws.
(b) Connect the airbag connector.
(c) Connect the connectors.
(d) Install the 2 screws.
9. INSTALL DUCT HEATER TO REGISTER NO.2
Install the screw.
10. INSTALL LOWER FINISH PANEL NO.1
(a) Install the lock nuts and light control rheostat.
(b) Tighten the 4 panel set bolts.
(c) Install the cowl side trim and clip.
(d) Install the front door scuff plate with the 4 screws.
(e) Install the engine hood release lever with the 2 screws.
11. INSTALL UPPER AND LOWER COLUMN COVERS
A/T:
Install the 6 screws.
M/T:
Install the 7 screws.
12. CENTER SPIRAL CABLE
(a) Check that the front wheels are facing straight ahead.
(b) Turn the spiral counterclockwise by hand until it becomes harder to turn the cable.
(c) Then turn the spiral cable clockwise about 3 turns to align the red mark.
HINT: The spiral cable turns clockwise about 3 turns to either left or right of the center.
13. INSTALL STEERING WHEEL
(a) Align the matchmarks on the wheel and main shaft.
(b) Torque the set nut.
Torque: 35 N.m (360 kgf.cm, 26 ft.Ibf)
(c) Connect the connector.
14. INSTALL STEERING WHEEL PAD
NOTICE:
-
Make sure the wheel pad is installed to the specified torque.
-
If the wheel pad has been dropped, or there are crack:, dent: In the case or connector. replace the wheel pad with a new one.