T100 SR5 Extra Cab Pickup 2WD V6-3.4L (5VZ-FE) (1997)
Axle Nut: Specifications
Install the axle hub with the disc, as follows:
a. Place the axle hub on the spindle.
b. Install the bearing and thrust washer.
Adjust the preload, as follows:
a. Install and torque the nut.
Torque: 35 Nm (26 ft. lbs.).
b. Snug down the bearing by turning the hub several times.
c. Loosen the nut until it can be turned by hand.
d. Using a spring tension gauge, measure and make a note of the frictional force of the oil seal.
Preload (at starting): 4.0 N (0.9 lbs.) or less.
NOTE: Make sure to check preload in the direction of rotation.
e. Tighten the nut until the preload is within the specification.
Preload (at starting): 5.0 - 14.0 N (1.1 - 3.1 lbs.).
NOTE: Make sure to check preload in the direction rotation.