T100 SR5 Extra Cab Pickup 2WD V6-3.4L (5VZ-FE) (1997)
e. Tighten the nut until the preload is within the specification.
Preload (at starting): 5.0 - 14.0 N (1.1 - 3.1 lbs.).
NOTE: Make sure to check preload in the direction rotation.
f.
Using a dial indicator, measure the hub bearing backlash.
Backlash: 0.05 mm (0.0020 inch).
9. Install the lock cap, cotter pin and the grease cap, as follows:
a. Install the lock cap and a new cotter pin.
b. Install the grease cap.
10. Install brake caliper. Install the two brake caliper set bolts.
Torque: 108 Nm (80 ft. lbs.).
11. With ABS, connect ABS speed sensor to the steering knuckle.
Torque: 8.0 Nm (71 inch lbs.).
12. Install the front wheel.
Torque: 103 N m (76 ft. lbs.).
13. Check the front wheel alignment.
14. With ABS, check the ABS speed sensor signal.