T100 SR5 Extra Cab Pickup 2WD V6-3.4L (5VZ-FE) (1997)
C. Lift off upper valve body and plate as a single unit holding the valve body plate to the upper valve body as shown in the illustration.
Caution: Be careful that the check balls and strainer do not fall out.
2. Modification:
A. Turn over the upper valve body, remove plate & gaskets.
B. Add new check ball in the location shown in illustration.
3. Assembly:
A. GReassemble upper and lower valve body halves using new gaskets.
B. GInstall 25 bolts to upper valve body.
Torque: 56 in. lbs. (6.4 N/m, 65 kgf/cm)
Caution: Careful to reinstall the bolts in their proper locations as shown in the illustration.
Bolt Length:
A:
38 mm (1.50")
B:
20 mm (0.79")
C:
28 mm (1.10")
C. Complete reassembly as described in the Repair Manual for the vehicle being serviced.