toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Variable Valve Timing Actuator > < Camshaft (For Bank 1)|Page 1901
Page 10
background image

h. Release the chain tension between the camshaft timing gear (RH bank) and crankshaft timing gear by turning the crankshaft pulley clockwise

slightly.

4. INSTALL NO. 1 CHAIN TENSIONER ASSEMBLY 
5. SET NO. 1 CYLINDER TO TDC/COMPRESSION
6. INSPECT VALVE CLEARANCE
7. ADJUST VALVE CLEARANCE
8. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY LH
9. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY

10. INSTALL IGNITION COIL ASSEMBLY 

Torque: 10 Nm (102 kgf-cm, 7.4 ft. lbs.) 

11. INSTALL INTAKE AIR SURGE TANK
12. INSTALL AIR CLEANER ASSEMBLY
13. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque: 3.9 Nm (40 kgf-cm, 35 inch lbs.) 

14. ADD ENGINE COOLANT
15. CHECK FOR ENGINE COOLANT LEAKAGE
16. INSTALL V-BANK COVER 

a. Install the V-bank cover with the 2 nuts. 

Torque: 7.5 Nm (76 kgf-cm, 66 inch lbs.) 

17. INSPECT IGNITION TIMING

Variable Valve Timing Actuator > < Camshaft (For Bank 1)|Page 1901