toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

On-Vehicle Inspection|Page 3811 > < On-Vehicle Inspection|Page 3809
Page 2
background image

5. REMOVE THROTTLE WITH MOTOR BODY ASSEMBLY

a. Disconnect the water by-pass hose No. 5.

b. Disconnect the water by-pass hose No. 4.

c. Disconnect the throttle motor connector.
d. Remove the 4 bolts, then remove the throttle w/ motor body and gasket.

INSTALLATION

1. INSTALL THROTTLE WITH MOTOR BODY ASSEMBLY

a. Install a new gasket and the throttle with motor body with the 4 bolts.

Torque: 11 N.m (112 kgf.cm, 9 ft.lbf)

b. Connect the throttle motor connector.
c. Connect the water by-pass hose No. 4.
d. Connect the water by-pass hose No. 5.

2. INSTALL AIR CLEANER ASSEMBLY

a. Install the air cleaner with the 2 bolts.

Torque: 8.0 N.m (82 kgf.cm, 71 in.lbf)

b. Connect the ventilation hose No. 2.

3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque: 3.9 N.m (40 kgf.cm, 35 in.lbf)

On-Vehicle Inspection|Page 3811 > < On-Vehicle Inspection|Page 3809