Tacoma 2WD V6-4.0L (1GR-FE) (2006)
8. INSTALL POWER STEERING OIL PRESSURE SWITCH
a. Coat the O-ring with power steering fluid and install it onto the power steering oil pressure switch.
b. Install the power steering oil pressure switch onto the vane pump.
Torque: 21 Nm (214 kgf-cm, 15 ft. lbs.)
9. INSTALL FLOW CONTROL VALVE
a. Coat the compression spring and flow control valve with power steering fluid.
b. Install the compression spring and flow control valve.
c. Coat a new O-ring with power steering fluid and install it onto the pressure port union.
d. Install the pressure port union.
Torque: 69 Nm (704 kgf-cm, 51 ft. lbs.)
10. INSTALL POWER STEERING SUCTION PORT UNION
a. Coat a new O-ring with power steering fluid, and install it onto the suction port union.
b. Install the suction port union with the bolt.
Torque: 12 Nm (122 kgf-cm, 9 ft. lbs.)
INSTALLATION
1. INSTALL VANE PUMP
a. Install the vane pump assembly with the 2 bolts.
Torque: 21 Nm (214 kgf-cm, 15 ft. lbs.)
b. Install the wire harness clamp bracket with the bolt.
Torque: 8.0 Nm (82 kgf-cm, 71 inch lbs.)
c. Connect the oil pressure switch connector.
NOTICE: Make sure that no oil adheres to the connector.