toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Timing Component Alignment Marks > < Timing Belt|Specifications|Page 735
Page 13
background image

b. Install the drive belt.
c. Connect the A/C compressor connector.

23. CONNECT PS PUMP TO ENGINE

a. Temporarily install the PS pump with the bolt and nut
b. Install the drive belt.
c. Tighten the bolt and nut.

Torque: 43 Nm (440 kgf-cm, 31 ft. lbs.) 

d. Install the PS pressure tube clamp with the bolt.
e. Connect the 2 PS air Hoses to the air intake chamber and resonator.

24. CONNECT UPPER RADIATOR HOSE
25. FILL ENGINE WITH COOLANT
26. START ENGINE CHECK FOR LEAKS
27. INSTALL ENGINE UNDER COVER
28. PERFORM ROAD TEST

Check for abnormal noise, shock, slippage, correct shift points and smooth operation.

29. RECHECK ENGINE COOLANT LEVEL

Timing Component Alignment Marks > < Timing Belt|Specifications|Page 735