Tundra 2WD V6-4.0L (1GR-FE) (2005)
d. Install the water inlet with the 5 bolts.
Torque: 9.0 Nm (92 kgf-cm, 80 inch lbs.)
e. Connect the 5 water by-pass hoses.
f.
Connect the 2 radiator hoses.
g. Connect the 2 oil cooler hoses (w/ oil cooler).
7. INSTALL AIR CLEANER
8. CONNECT VENTILATION HOSE NO.2
9. INSTALL FAN W/ FLUID COUPLING
a. Put the fan pulley to the water pump.
b. Put the fan w/ fluid coupling and fan shroud together.
c. Temporarily install the 4 fluid coupling nuts.
d. Tighten the 4 fan shroud bolts.
Torque: 5.0 Nm (51 kgf-cm, 44 inch lbs.)
e. Connect the reserve tank hose. (9 Fasten the 2 oil cooler hoses with the hose clamp.
10. INSTALL FAN AND GENERATOR V BELT
11. FULLY TIGHTEN FAN W/ FLUID COUPLING
a. Tighten the 4 fluid coupling bolts.
Torque: 21 Nm (214 kgf-cm, 15 ft. lbs.)
12. ADD ENGINE COOLANT
13. CHECK FOR ENGINE COOLANT LEAKS
14. INSTALL ENGINE UNDER COVER
a. Install the engine under cover with the 4 bolts.
Torque: 29 Nm (296 kgf-cm, 21 ft. lbs.)
15. INSTALL V-BANK COVER
a. Install the V-bank cover with the 2 nuts.
Torque: 9.8 Nm (100 kgf-cm, 87 inch lbs.)
16. RECHECK ENGINE COOLANT LEVEL
17. FILL WITH ENGINE COOLANT
18. START ENGINE AND CHECK FOR ENGINE COOLANT LEAKS
19. RECHECK ENGINE COOLANT LEVEL