Tundra Access Cab SR5 2WD V6-3.4L (5VZ-FE) (2000)
1. Temporarily install new terminal insulator (inside).
2. Temporarily install new contact plate.
3. Temporarily install new terminal bolt.
4. Temporarily install new O-ring.
5. Temporarily install new terminal insulator (outside).
6. Temporarily install new wave washer.
7. Temporarily install new terminal nut.
NOTE: Be careful to install the terminal insulator (inside) in the correct direction.
f.
Temporarily tighten the terminal nuts.
g. Tighten the terminal nuts.
1. Put a wooden block on the contact plate and press it down with a hand press.
Dimensions of wooden block:
20 x 37 x 40 mm (0.79 x 1.46 x 1.57 in.)
Press force:
981 N (100 kg, 221 lb)
Gauge Pressure
NOTE:
-
Check the diameter of the hand press ram. Then calculate the gauge pressure of the press when 981 N (100 kg, 221 lb) of force is
applied.
-
If the contact plate is not pressed down with the specified pressure, the contact plate may tilt due to coil deformation or the tightening
of the nut.