Venza AWD L4-2.7L (1AR-FE) (2009)
Daytime Running Lamp Relay: Service and Repair
Installation
POWER DISTRIBUTION: INTEGRATION RELAY: INSTALLATION
INSTALLATION
1. INSTALL POWER DISTRIBUTION
(a) Connect the 3 connectors.
(b) Engage the 2 claws to temporarily install the power distribution as shown in the illustration.
(c) Install the power distribution with the bolt.