Venza AWD V6-3.5L (2GR-FE) (2010)
Bolt - Torque : 29 Nm (296 kgf-cm, 21 ft-lbf)
Nut - Torque : 5.5 Nm (56 kgf-cm, 49 in-lbf)
16. INSTALL FRONT DOOR LOCK OPEN ROD
(a) Install the front door lock open rod as indicated by the arrows, in the order shown in the illustration.
17. INSTALL FRONT DOOR OUTSIDE HANDLE FRAME SUB-ASSEMBLY
(a) Apply MP grease to the sliding parts on the front door outside handle frame sub-assembly.
(b) Engage the door handle nut and claw.
(c) Using a T30 "TORX" socket wrench, install the front door outside handle frame sub-assembly with the screw.
Torque : 4.0 Nm (41 kgf-cm, 35 in-lbf)
18. INSTALL ELECTRICAL KEY WIRE HARNESS (w/ Smart Key System)
(a) Engage the 4 clamps and install the electrical key wire harness.