Venza AWD V6-3.5L (2GR-FE) (2010)
Control Module HVAC: Service and Repair
Installation
HEATING / AIR CONDITIONING: AIR CONDITIONING AMPLIFIER: INSTALLATION
1. INSTALL AIR CONDITIONING AMPLIFIER ASSEMBLY
(a) Install the air conditioning amplifier assembly with the 2 screws.
(b) Connect each connector.
NOTICE:
Be careful when installing the air conditioning amplifier assembly. If the air conditioning amplifier assembly is dropped, replace it
with a new one.
2. INSTALL LOWER INSTRUMENT PANEL SUB-ASSEMBLY See: Body and Frame/Interior Moulding / Trim/Dashboard / Instrument
Panel/Service and Repair/Removal and Replacement/Installation
3. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY See: Body and Frame/Interior Moulding / Trim/Dashboard /
Instrument Panel/Service and Repair/Removal and Replacement/Installation
4. INSTALL COWL SIDE TRIM SUB-ASSEMBLY RH
HINT
Use the same procedure for the RH side and the LH side See: Body and Frame/Interior Moulding / Trim/Headliner/Service and
Repair/Removal and Replacement/Installation.
5. INSTALL FRONT DOOR SCUFF PLATE RH
HINT
Use the same procedure for the RH side and the LH side See: Body and Frame/Interior Moulding / Trim/Headliner/Service and
Repair/Removal and Replacement/Installation.
6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected See: Testing and
Inspection/Programming and Relearning/Repair Instruction - Initialization.