Venza FWD L4-2.7L (1AR-FE) (2009)
Thermostat: Service and Repair
Installation
1AR-FE COOLING: THERMOSTAT: INSTALLATION
INSTALLATION
1. INSTALL THERMOSTAT
(a) Install a new gasket to the thermostat.
(b) Install the thermostat with the jiggle valve facing upward.
HINT: The jiggle valve may be set to within 10° on either side of the prescribed position.
2. INSTALL WATER INLET
(a) Install the water inlet with the 2 nuts.
Torque: 10 Nm (102 kgf-cm, 7ft-lbf)
3. CONNECT NO. 2 RADIATOR HOSE See: Engine/Service and Repair/Removal and Replacement/Engine Assembly/Installation
4. INSTALL GENERATOR ASSEMBLY See: Starting and Charging/Charging System/Alternator/Service and Repair/Installation
5. INSTALL WIRE HARNESS CLAMP BRACKET See: Starting and Charging/Charging System/Alternator/Service and Repair/Installation
6. INSTALL V-RIBBED BELT
HINT: See: Engine/Drive Belts, Mounts, Brackets and Accessories/Drive Belt/Service and Repair/Installation
7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected See: Testing and
Inspection/Repair Instruction - Initialization.
8. ADD ENGINE COOLANT See: Coolant/Service and Repair
9. INSPECT FOR COOLANT LEAK See: Engine/Engine Lubrication/Engine Oil/Service and Repair/Replacement
10. INSTALL COOL AIR INTAKE DUCT SEAL See: Engine/Service and Repair/Removal and Replacement/Engine Assembly/Installation
11. INSTALL NO. 1 ENGINE UNDER COVER
12. INSTALL NO. 2 ENGINE UNDER COVER
13. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY See: Engine/Service and Repair/Removal and Replacement/Engine Assembly/Installation