Venza FWD V6-3.5L (2GR-FE) (2010)
NG -- REPAIR OR REPLACE CAN BUS MAIN WIRE OR CONNECTOR (ECM MAIN WIRE)
OK -- Continue to next step.
2. CHECK HARNESS AND CONNECTOR (POWER SOURCE TERMINAL)
(a) Check for ECM Power Source Circuit (1AR-FE: See: Testing and Inspection/Component Tests and General Diagnostics/ECM Power
Source Circuit, 2GR-FE: See: Testing and Inspection/Component Tests and General Diagnostics/ECM Power Source Circuit).
Result:
C -- REPAIR OR REPLACE HARNESS OR CONNECTOR (POWER SOURCE CIRCUIT)
B -- REPLACE ECM See: Engine Control Module/Service and Repair/Removal
A -- REPLACE ECM See: Engine Control Module/Service and Repair/Removal
Power Management Control ECU Communication Stop Mode
NETWORKING: CAN COMMUNICATION SYSTEM: Power Management Control ECU Communication Stop Mode
- Power Management Control ECU Communication Stop Mode
DESCRIPTION
WIRING DIAGRAM