vauxhall Workshop Repair Guides

Vauxhall Workshop Service and Repair Manuals

Injection Nozzles, Remove and Install > < Engine X20DTL

Injection Nozzle Traverse, Remove and Install

Important:   On removal, lay injection nozzle traverse aside in correct order to ensure correct allocation on reinstallation

  Remove

1.   Remove injection lines
•   For X 20 DTL, Y 20 DTL, Y 20 DTH up to MY 2003 LUREF_1.gif
•   For Y 20 DTH as of MY 2003, Y 22 DTR LUREF_1.gif
2.   Remove inlet manifold upper section
•   For X 20 DTL, Y 20 DTL, Y 20 DTH up to MY 2003 LUREF_1.gif
•   For Y 20 DTH as of MY 2003, Y 22 DTR LUREF_1.gif
3.   Remove cylinder head cover
4.   Remove camshaft
5.   Remove valve bridges
6.   Detach oil leak line from injection nozzle traverse.
7.   Remove fastening bolt (1)
•   Raise injector nozzle traverse slightly and pull forward out of cylinder head
8.   Place new seal ring (2) on injection nozzle
Object Number: 2396068  Size: DEFAULT


  Install

Important:   The use of KM-6318 is mandatory in order to prevent damage to the gaskets
9.   Place KM-6318-2 (2) over camshaft bearing 2 (3)
•   Ensure that the sliding surfaces (4) point to the control side
10.   Fit KM-6318-1 (1) on camshaft bearing 2
•   Note the displacement of the holes (7) of the camshaft bearing and screws (5) from KM-6318-1
•   Stop (6) must be located on the transmission side of KM-6318-1
11.   Slide KM-6318-2 in direction of arrow until stop lies against KM-6318-1
Object Number: 2412023  Size: DEFAULT


12.   Shove new seal ring (1) on injector nozzle traverse
13.   Carefully insert the injector nozzle traverse of cylinder 1 and 2 until it lies flush (arrow) in the cylinder head
•   If necessary, assist with light taps using plastic mallet
•   Ensure that no dirt enters the injector nozzle traverse as this can cause malfunctions
14.   Slide KM-6318-2 (3) in direction of arrow, detach KM-6318-1 (2) from camshaft bearing 2 and remove KM-6318-2
15.   Repeat installation of injection nozzle traverse using KM-6318 for cylinders 3 and 4
Object Number: 2412024  Size: DEFAULT


Important:   The tightening procedure described in the following is the only way to guarantee that the injection nozzle traverse is correctly tensioned on the injection nozzle
16.   Insert traverse injection nozzle with new fastening bolt
•   I: Hand-tighten fastening bolt using torx nut and extension (without toggle or ratchet)
•   II: Then turn another 360°
Object Number: 2400023  Size: DEFAULT


17.   Attach new oil leak lines to injection nozzle traverse
18.   Install valve bridges
19.   Install camshaft
20.   Install cylinder head cover
21.   Install inlet manifold upper section
•   For X 20 DTL, Y 20 DTL, Y 20 DTH up to MY 2003 LUREF_1.gif
•   For Y 20 DTH as of MY 2003, Y 22 DTR LUREF_1.gif
22.   Install injection lines
•   For X 20 DTL, Y 20 DTL, Y 20 DTH up to MY 2003 LUREF_1.gif
•   For Y 20 DTH as of MY 2003, Y 22 DTR LUREF_1.gif

Related Literature Units
-
-

Injection Nozzles, Remove and Install > < Engine X20DTL