vauxhall Workshop Repair Guides

Vauxhall Workshop Service and Repair Manuals

Throttle Body, Remove and Install (X 20 XEV, X 20 XER) > < Engine X20XEV

Throttle Body (Throttle Valve Adjuster), Remove and Install (X 18 XE1)

  Remove

Remove engine cover (3).

Disconnect wiring harness plug (1) from hot film mass air flow meter.

Detach air intake manifold (2) together with hot film mass air flow meter from upper part of air cleaner housing and from throttle body.

Press throttle valve lever (9) in direction of "full acceleration" and hold in position. Lift retainer (7) with screwdriver and remove ball socket (8) from ball head.

If present: remove shackle for cruise control Bowden cable (10). Compress guide for cruise control Bowden cable at the two pins (4) and remove from bracket – lay cruise control Bowden cable aside. Detach retaining clamp (5) upwards and pull guide for accelerator Bowden cable out of bracket and lay aside.

Detach engine vent hose (6) from cylinder head cover and throttle body.

Object Number: 2415415  Size: DEFAULT

Remove hose for tank vent valve (2) from throttle body.

Detach coolant hoses (1) from throttle body – collect escaping coolant.

Disconnect wiring harness plug (3) from throttle valve adjuster.

Object Number: 2398398  Size: DEFAULT

Remove fastening bolts (1) – remove throttle body from intake manifold.

  Clean

Clean sealing surfaces and remove gasket residues.

  Install

Attach throttle body with new gasket to intake manifold – tightening torque 8 Nm / 6 lbf. ft.

Attach wiring harness plug to throttle valve adjuster.

Attach coolant hoses and tank vent valve hose to throttle body.

Attach engine vent hoses.

Object Number: 2398399  Size: DEFAULT

If present: allow guide for cruise control Bowden cable to engage into bracket and connect cruise control Bowden cable onto ball head. Install guide for accelerator Bowden cable into bracket and insert retaining clamp behind intermediate washer. Clip ball socket for accelerator Bowden cable to ball head – ensure that retainer engages.

Attach air intake manifold together with hot film mass air flow meter to upper part of air cleaner housing and to throttle body.

Attach wiring harness plug to hot film mass air flow meter.

Install engine cover.

  Adjust

When replacing the throttle body it is essential that the adaptation value for the throttle valve in the EEPROM of the engine control unit is deleted using TECH 2 – see corresponding Checking Procedures.

  Inspect

Charge and bleed cooling system – see operation "Cooling System, Charge and Bleed" and "Cooling System, Check for Leaks".


Related Literature Units
-
-
-
-

Throttle Body, Remove and Install (X 20 XEV, X 20 XER) > < Engine X20XEV