Astra G
Intake Manifold, Remove and Install (Z 16 SE) Caution Fuel leak – observe safety regulations and national legislation. Reduce fuel pressure with Pressure Tester KM-J-34730-91 via testing port – collect escaping fuel in suitable container.
Install Attach intake manifold to cylinder head with new gasket – tightening torque 22 Nm / 16 lbf. ft. 1) Attach fuel line to fuel distributor pipe and clip in bracket. Attach coolant hose to intake manifold. Attach alternator to alternator shackle – tightening torque 20 Nm / 15 lbf. ft. Attach alternator support to alternator and intake manifold – tightening torque 20 Nm / 15 lbf. ft. Route wiring harness and attach wiring harness bracket to intake manifold – tightening torque 20 Nm / 15 lbf. ft. Connect wiring harness plug to injectors, camshaft sensor, throttle body and oxygen sensor. Attach ground cable to engine control unit. Connect wiring harness plug to exhaust gas recirculation valve and intake pipe pressure sensor. Attach exhaust gas recirculation valve wiring harness bracket and intake pipe pressure sensor to engine control unit. Connect wiring harness plug to engine control unit and lock. Attach coolant hoses to throttle body. Attach brake servo vacuum hose to intake manifold. Attach tank vent valve hose to throttle body. Install ribbed V-belt – see operation "Ribbed V-belt, Remove and Install". Install air cleaner housing with air intake hose – see illustration "Air Cleaner Housing (Z 16 SE)". Attach tank vent valve to air cleaner housing and connect wiring harness plug to tank vent valve. Attach engine vent hoses to camshaft housing cover. Close coolant drain bolt. Connect ground cable to battery. Inspect Charge cooling system – see operations "Cooling System, Charge and Bleed" and "Cooling System, Check for Leaks". 1 ) Use new fastening bolts). |
||||||||||||||
|