Insert 6 gaskets (1) and (2) and apply sealing compound to
transmission housing.
Attach converter housing to transmission housing (15 fastening
bolts) – tightening torque 25 Nm / 18 lbf. ft. Insert
fastening bolts (3) with locking compound.
Install converter – see operation "Converter and/or Fluid
Pump Seal Ring, Replace (AF 13-II/AF 17/AF 20/AF 22)".
Remove assembly from Bracket KM-113-2 and Bracket KM-910 from
transmission.
Install transmission – see operation "Transmission, Remove
and Install (AF 13-II/AF 17)".
|