vauxhall Workshop Repair Guides

Vauxhall Workshop Service and Repair Manuals

Centre Valve Body, Disassemble and Assemble (AF 17) > < Valve Body, Disassemble and Assemble (AF 17)

Front Valve Body, Disassemble and Assemble (AF 17)

Note:   The valve body should only be disassembled for cleaning purposes as the individual parts are not available from suppliers.

  Remove

Remove valve body – see operation "Valve Body, Remove and Install (Transmission Removed) (AF 17)".

  Disassemble

Disassemble valve body – see operation "Valve Body, Disassemble and Assemble (AF 17)".

Remove modulator valve B1 consisting of modulator piston (1) with spring (2) plug (4) and wedge (3).

Remove valve for neutral control consisting of piston (8) with spring (7) plug (6) and wedge (5).

  Assemble

Insert all parts for neutral control consisting of piston (8) with spring (7) plug (6) and wedge (5).

Insert modulator valve B1 consisting of modulator piston (1) with spring (2) plug (4) and wedge (3).

Object Number: 2414120  Size: DEFAULT

Assemble valve body – see operation "Valve Body, Disassemble and Assemble (AF 17)".

  Install

Install valve body – see operation "Valve Body, Remove and Install (Transmission Removed) (AF 17)".


Related Literature Units
-
-
-
-

Centre Valve Body, Disassemble and Assemble (AF 17) > < Valve Body, Disassemble and Assemble (AF 17)