vauxhall Workshop Repair Guides

Vauxhall Workshop Service and Repair Manuals

Rear Valve Body, Disassemble and Assemble (AF 17) > < Front Valve Body, Disassemble and Assemble (AF 17)

Centre Valve Body, Disassemble and Assemble (AF 17)

Note:   The valve body should only be disassembled for cleaning purposes as the individual parts are not available from suppliers. Thus extreme care should be exercised when performing this work.

  Remove

Remove valve body – see operation "Valve Body, Remove and Install (Transmission Removed) (AF 17)".

  Disassemble

Disassemble valve body – see operation "Valve Body, Disassemble and Assemble (AF 17)".

Remove primary control valve consisting of primary control valve (3), with spring, primary control valve piston (2), primary control valve sleeve (1) with primary control valve wedge.

Remove converter clutch modulator consisting of converter clutch modulator (4) with spring, converter clutch modulator plug (5) with converter clutch modulator wedge.

Remove 3/4-way shift valve consisting of 3/4-way shift valve (6) with spring, 3/4-way shift valve sleeve (7) 3/4-way shift valve plug with 3/4-way shift valve wedge.

Remove 2/3 shift valve consisting of 2/3 shift valve with spring, 2/3 shift valve plug with 2/3 shift valve wedge.

Object Number: 2414121  Size: DEFAULT

Remove 1/2 shift valve consisting of 1/2 shift valve (4) with spring, 1/2 shift valve plug with 1/2 shift valve wedge.

Remove modulator valve B1 consisting of modulator valve B1 (6) with spring, modulator valve B1 sleeve (5), modulator valve B1 plug with modulator valve B1 wedge.

Remove accumulator control valve consisting of accumulator control valve (3), with spring, accumulator control valve piston (2), accumulator control valve plug (1) with accumulator control valve wedge.

  Inspect

Check all parts for wear or damage and replace valve body if necessary.

Object Number: 2414124  Size: DEFAULT

  Assemble

Insert accumulator control valve consisting of accumulator control valve (3), with spring, accumulator control valve piston (2), accumulator control valve plug (1) and lock with accumulator control valve wedge.

Insert modulator valve B1 consisting of modulator valve B1 (6) with spring, modulator valve B1 sleeve (5), modulator valve B1 plug and lock with modulator valve B1 wedge.

Insert 1/2 shift valve consisting of 1/2 shift valve (4) with spring, 1/2 shift valve plug and lock with 1/2 shift valve wedge.

Object Number: 2414124  Size: DEFAULT

Insert 2/3 shift valve consisting of 2/3 shift valve with spring, 2/3 shift valve plug and lock with 2/3 shift valve wedge.

Insert 3/4-way shift valve consisting of 3/4-way shift valve (6) with spring, 3/4-way shift valve sleeve (7) 3/4-way shift valve plug and lock with 3/4-way shift valve wedge.

Insert converter clutch modulator consisting of converter clutch modulator (4) with spring, converter clutch modulator plug (5) and lock with converter clutch modulator wedge.

Insert primary control valve consisting of primary control valve (3), with spring, primary control valve piston (2), primary control valve sleeve (1) and lock with primary control valve wedge.

Object Number: 2414121  Size: DEFAULT

Assemble valve body – see operation "Valve Body, Disassemble and Assemble (AF 17)".

  Install

Install valve body – see operation "Valve Body, Remove and Install (Transmission Removed) (AF 17)".


Related Literature Units
-
-
-
-

Rear Valve Body, Disassemble and Assemble (AF 17) > < Front Valve Body, Disassemble and Assemble (AF 17)