Engine, Remove and Install
Remove
2. |
Remove steering column interim spindle
• |
Move steering wheel to straight-ahead position
|
• |
Remove ignition key and engage steering lock
|
|
|
|
3. |
Detach radiator grille (2)
• |
Detach 4x body-bound rivets (1)
|
• |
Unclip from front panelling
|
|
|
|
4. |
Empty climate control system
• |
Connect service station
|
• |
Blue hose to low-pressure service connection with small
diameter
|
• |
Red hose to high-pressure service connection with large
diameter
Note: Read Service
Station operating instructions carefully
|
• |
Determine quantity of condenser extracted at the oil separator
of the Service Station
|
|
|
|
5. |
Raise vehicle by its full height
|
6. |
Detach the lower engine cover and right engine splash guard
|
7. |
Place collecting basin underneath.
|
8. |
Drain coolant
• |
Open drain bolt on radiator (1)
|
|
|
|
9. |
Lower vehicle by its full height
|
10. |
Remove battery
• |
Detach 2x earth cable from earth connection
|
• |
Detach earth terminal from battery
|
• |
Detach positive cable from positive clamp
|
• |
Detach positive connection from battery
|
|
|
|
11. |
Remove battery support.
• |
Remove pre-glow system control unit (4)
|
• |
Remove wiring harness plug (3)
|
• |
Detach wiring harness
– |
Detach 2x cable ties (1)
|
|
|
|
|
12. |
Remove air cleaner housing (5) with air intake hose
• |
Detach wiring harness plug (2) from hot film mass air flow
meter
|
• |
Detach air intake hose from air intake pipe
|
• |
Detach air cleaner housing from wheel housing
|
• |
Detach water drain hose (3) from air cleaner housing
|
|
|
|
13. |
Remove engine cover (2)
• |
Detach oil filler port closure cap (1)
|
• |
Pull off engine cover
Note: Rubber retainers
(3) must remain on engine cover
|
• |
Attach oil filler port closure cap
|
|
|
|
14. |
Disconnect refrigerant line
|
|
|
15. |
Detach fuel supply lines from high-pressure pump
• |
Detach from return line connection (1)
|
• |
Detach from supply line connection (2)
|
|
|
|
16. |
Remove brake force amplifier vacuum line (2)
• |
Unclip brake force amplifier vacuum line and set aside
|
|
|
|
17. |
Disconnect 2x coolant hose (1) from heater core
• |
Release 2x coolant hoses in direction of arrow
|
|
|
|
18. |
Detach 3x coolant hoses (1) from coolant expansion tank
|
|
|
19. |
Disconnect starter wiring harness
• |
Disconnect wiring harness plug (2)
|
• |
Put wiring harness (1) aside on drive unit
|
|
|
|
20. |
Detach pressure line (1) from wiring harness connection
piece
• |
Release clamp with screwdriver in direction of arrow and
remove
|
• |
Bend clip together a little and insert back into connecting
piece
|
|
|
|
21. |
Disconnect shift cables (1) from shift assembly with
KM-6042
Important: Shift cables must not
be stretched, twisted or kinked
|
• |
|
|
|
|
22. |
Remove coolant expansion tank (1)
• |
Pull from bracket in direction of arrow
|
|
|
|
23. |
Disconnect steering wiring harness
• |
Remove fuse carrier cover (1)
|
• |
Detach positive cable (2) from fuse carrier
Note: Mark installation
position
|
• |
Disconnect wiring harness connector (3)
|
• |
Expose wiring harness and put aside on drive unit
|
|
|
|
24. |
Disconnect upper engine timing wiring harness
• |
Detach positive cable (1) from fuse carrier
Note: Mark installation
position
|
• |
Disconnect wiring harness plug (2)
|
• |
Put engine timing wiring harness with pre-heating system
control unit (3) aside on drive unit
|
|
|
|
26. |
Raise vehicle by half its height
|
28. |
Undo front panelling (1)
• |
Remove 5x body-bound rivets (3)
|
|
29. |
Remove front panelling
Note: Second
mechanic
• |
Push front panelling upwards in direction of arrow and pull out
of bracket
|
• |
Unclip outside temperature sensor
|
|
|
|
30. |
Detach front part of right wheelhouse panelling
• |
Remove 3x body-bound rivets
|
|
31. |
Disconnect cooling module wiring harness
• |
Disconnect wiring harness plug (2)
|
|
|
|
32. |
Detach lower engine timing wiring harness
• |
Detach wiring harness plug (1) from engine control unit
|
|
|
|
33. |
Detach refrigerant line (1)
• |
Remove from desiccant box
|
|
|
|
34. |
Detach 2x swing arms (2)
• |
Unscrew 2x nuts
– |
Use spanner (1) to hold against flat surface
|
|
|
35. |
Detach 2x tie rods
• |
2x nuts
– |
Force back from steering knuckle with KM-507-C (3)
|
|
|
36. |
Detach 2x steering knuckle pins
• |
Detach 2x screw connections
|
• |
Spread steering knuckle pins with KM-915 (4) and draw guiding joint out of steering
knuckle
|
|
|
|
37. |
Detach 2x axle shafts
• |
Unscrew 2x nuts
– |
Counterhold at wheel hub with KM-468-B (1)
|
|
|
|
|
38. |
Raise vehicle by half its height
|
39. |
Remove front exhaust pipe
• |
Detach from start-up catalytic converter
|
• |
Detach from central silencer
|
|
|
|
40. |
Insert KM-6173 (3)
• |
Align support bearing (1)
|
• |
Raise support bearing until journal (2) sits flush in mount
(4)
|
|
|
|
41. |
Attach KM-6001-A (1)
Note: Attaching
KM-6001-A guarantees perfect alignment of the drive unit with the
front axle body
• |
Slacken 4x bolts (arrows) in adjusting rails
|
• |
Insert KM-6001-A
– |
Insert journals (2) and (5) in guide holes in front axle
body
|
|
• |
Tighten 4x bolts in adjusting rails
|
• |
Adjust support bearings, front (4) and rear (3)
– |
Raise support bearings up to the stop on the guide journals
Note: The guide
journals must be seated free from play in the support bearings
|
|
|
|
|
42. |
Lower vehicle by its full height
|
43. |
Detach left engine damping block from transmission
|
|
|
44. |
Detach right engine damping block from engine damping block
adapter
|
|
|
45. |
Raise vehicle by its full height
|
46. |
Attach KM-904 with KM-6390
• |
Attach to hydraulic lifter
Note: Use hydraulic
jack that can be lowered to a height of at least 100 cm
|
• |
Lower centring pins (1)
|
• |
Place under front axle body, ensure there is no play
– |
Centring pins (2) must engage in the relevant holes in the
front axle body
|
|
|
|
|
Important: It is not permissible
to disassemble the front axle body with an impulse or impact
screwdriver
|
47. |
Remove front axle body
• |
Unscrew 10x bolts (1...4)
Note: Note different
bolt lengths
|
|
|
|
Important: Ensure that no
attached parts are damaged
|
48. |
Move out front axle body
Note: 2 people
|
Install
49. |
Check thread
• |
Check ease of movement of 10x cage nuts, replacing if
necessary
|
|
Important: Ensure that no
attached parts are damaged
|
50. |
Lift front axle body
Note: 2 people
|
Important: It is not permissible
to assemble the front axle body with an impulse or impact
screwdriver
|
51. |
Fit front axle body
• |
Tighten 10x new bolt 90 Nm + 45° +
15°
|
|
52. |
Detach KM-904 and KM-6390
|
53. |
Lower vehicle by its full height
|
54. |
Fit right-hand engine damping block
|
55. |
Fit left-hand engine damping block
|
56. |
Raise vehicle by its full height
|
57. |
Remove engine mount KM-6173
|
58. |
Remove engine mount KM-6001-A
|
59. |
Install front exhaust pipe
• |
Attach to start-up catalytic converter
|
• |
Attach to central silencer
|
|
60. |
Install lower engine cover and right engine splash guard
|
61. |
Lower vehicle by half its height
|
62. |
Install axle shafts in wheel hub
• |
Insert guiding joint into steering knuckle
|
• |
Tighten 2x nut 150 Nm , slacken
45° , then tighten to 250 Nm
|
• |
Counterhold at wheel hub with KM-468-B
|
|
63. |
Attach guide joint to steering knuckle
• |
Tighten 2x new screwed joint 50
Nm
|
|
64. |
Attach tie rods to steering knuckle
• |
Screw in 2x new nut 30 Nm + 90° +
15
|
|
65. |
Attach swing arm to spring strut support tube
• |
Use spanner to counterhold against flat surface
|
|
66. |
Attach refrigerant line to desiccant bottle
|
67. |
Attach lower engine timing wiring harness
Note: Ensure cable is
routed correctly
• |
Connect wiring harness plug to engine control unit
|
|
68. |
Connect cooling module wiring harness
Note: Ensure cable is
routed correctly
• |
Fix wiring harness plug
|
|
69. |
Attach front part of right wheelhouse panelling
• |
Install 3x body-bound rivets
|
|
70. |
Insert front panelling
Note: Second
mechanic
• |
Clip in outside temperature sensor
|
|
71. |
Fit front panelling
• |
Install 5x body-bound rivets
|
|
73. |
Lower vehicle by half its height
|
74. |
Tighten front wheels
• |
Tighten 5x bolts 110 Nm
|
|
75. |
Connect engine timing wiring harness (top)
Note: Ensure cable is
routed correctly
• |
Lay wiring harness for engine timing with preheater system
control unit
|
• |
Attach positive cable to fuse carrier
|
• |
Fix wiring harness plug
|
|
76. |
Connect steering wiring harness
Note: Ensure cable is
routed correctly
• |
Detach positive cable from fuse carrier
|
• |
Attach fuse carrier cover
|
• |
Fix wiring harness plug
|
|
77. |
Install coolant expansion tank
|
78. |
Attach shift cables to shift assembly
Important: Shift cables must not
be stretched, twisted or kinked
|
• |
Clip shift cables into bracket
|
|
Important: Retaining clamp must
engage correctly
|
79. |
Attach pressure line to wiring harness connection piece
|
80. |
Connect starter wiring harness
Note: Note routing of
wires
• |
Fix wiring harness plug
|
|
81. |
Attach 3x coolant hoses to coolant expansion tank
|
Important: It is imperative to
adhere to the following assembly order
|
82. |
Attach cooling hoses to heater core
• |
Slide 2x quick release fitting locking mechanisms in direction
of arrow as far as they will go
– |
Plastic rings (green) will be covered
|
|
• |
Fit 2x quick release fittings onto heater core connecting piece
(1) as far as they will go
Note: Pay attention to
coloured markings
|
• |
Slide 2x quick release fitting locking mechanisms (3) in
direction of arrow as far as they will go
– |
Plastic rings (green) must be visible
|
|
• |
Check that quick release fittings are correctly seated and that
plastic rings (arrows) are visible
|
|
|
|
83. |
Fit brake force amplifier vacuum line
• |
Clip in brake force amplifier vacuum line
|
|
84. |
Attach fuel line to high-pressure pump
|
85. |
Connect refrigerant line
|
86. |
Install engine cover
• |
Detach oil filler port closure cap
|
• |
Attach oil filler port closure cap
|
|
87. |
Install air cleaner housing with air intake hose
• |
Attach water drain hose to air cleaner housing
|
• |
Attach air intake hose to air intake pipe
|
• |
Connect wiring harness plug to air mass flow meter
|
|
88. |
Install battery holder
• |
Attach pre-glow system control device
|
• |
Attach wiring harness plug
|
|
90. |
Connect battery
• |
Attach earth connection to battery
|
• |
Attach 2x earth cable to earth connection
|
• |
Attach positive connection to battery
|
• |
Attach positive cable to positive terminal
|
|
91. |
Top up coolant, correct if necessary
|
92. |
Top up coolant or ensure correct quantity is present.
|
93. |
Vent hydraulic clutch actuator
|
94. |
Top up climate control system
• |
Connect service station
|
• |
Connect blue hose to low pressure service connection with small
diameter
|
• |
Connect red hose to high pressure service connection with large
diameter
Note: Read Service
Station operating instructions carefully
|
• |
Use the Service Station to insert the quantity of new
compressor lubricant into the climate control system that was
extracted when it was emptied.
– |
Fill air conditioning system with R 134a refrigerant
|
|
|
|
|
95. |
Install radiator grille
• |
Clip upwards into front panelling
|
• |
Install 4x body-bound rivets
|
|
96. |
Install intermediate shaft clamp bolt, steering column
• |
Coat new bolt with locking compound (red) and screw in 22 Nm
|
|
97. |
Program volatile memories
|
|