Intake Manifold Assemble (LDC, LDD, LWD, L2I, L2N)
1. |
Install the evaporative
emission canister purge solenoid valve (2) to the intake manifold
(1). |
2. |
Install the 2 evaporative
emission canister purge solenoid valve bolts (3) and
tighten. |
3. |
Install the 5 NEW intake
manifold seal rings (1). |
4. |
Install the manifold absolute
pressure sensor (2). |
5. |
Install the manifold absolute
pressure sensor bolt (3) and tighten. |
6. |
Install the fuel injector (2)
to fuel rail. |
7. |
Install the fuel injector
retainer clamp (3). |
8. |
Install the fuel rail
(2). |
9. |
Install the 2 fuel rail bolts
(3) and tighten to 7 N·m(62 lb in) .
|
|