Corsa C
Injector, Common Rail Diesel, Z13DT
Objective: Check control and operation of the injector. Measurement: Injector control signal. Preparation: Engine oil temperature greater than 80°C . Switch off all electrical loads. Switch off the engine and ignition. Connections:
Procedure Tech 31:
If the voltage spikes vary considerably, the horizontal scaling factor can be increased to 500 micro-seconds/DIV to stabilise the display of the signal plot. Procedure Tech 32:
Setup File:
If the voltage spikes vary considerably, the horizontal scaling factor can be increased to 500 micro-seconds/DIV to stabilise the display of the signal plot. |
||||||||||||||||||||||||||