Field Remedy: 1853
Subject: |
Engine Z17DTH, high pressure pump - Reset
of learned values after replacement of high pressure pump |
Models: |
Engines: |
Option: |
Corsa-C 2003...2005,Corsa-C Combo
2005,Meriva 2004...2005 |
Z17DTH,Z17DTH,Z17DTH |
|
Complaint: |
After replacement of high pressure pump some
trouble codes (e.g. P1190) are set. |
Cause: |
Missing service information in TIS 2000
documentation to reset learned values after high pressure pump
replacement. |
Production: |
|
Remedy:
Once the high-pressure pump has been replaced it is important to tell this
to the ECU in order to reset the learn values. Otherwise some DTC´s might be set.
Please refer to TECH 2, change to menu: "Programming" , choose "High-pressure pump (fuel injection pump) replaced".
The service documentation will be modified accordingly.
FunctionalGroup: |
J - Engine |
Complaint Group: |
06 - Failure Code Setting by Control
Unit |
Trouble Code: |
P1190 |
|