vauxhall Workshop Repair Guides

Vauxhall Workshop Service and Repair Manuals

Throttle Valve Potentiometer > < Engine Z16SE

Multec-S engine management system (Z 14 XE) J852510 replace throttle valve module (Z 14 XE, Z 16 YNG)

1. Open bonnet

2. Remove engine cover (3)

  • Unscrew oil filler pipe cap
  • Remove 2 bolts
  • Screw on oil filler pipe cap

3. Remove suction pipe

  • Disconnect wiring harness plug from intake air temperature sensor (1)
  • Detach engine vent hose (2)
Object Number: 2411208  Size: DEFAULT

4. Disconnect wiring harness plug for throttle valve adjuster (5)

5. Detach throttle body module preheater hoses (2, 3)

  • 2 off
  • Place collecting basin underneath.

6. Detach engine vent hose (4)

  • From connection on throttle body module

7. Detach tank vent hose (1)

  • From connection on throttle body module

8. Remove throttle body module

  • Remove 4 bolts

9. Clean sealing surfaces

10. Install throttle body module

  • Note: Note guide sleeves
  • Replace gasket
  • Tighten bolts (8 Nm / 6 lbf. ft.)
Object Number: 2411209  Size: DEFAULT

11. Attach fuel evaporation hose

  • To connection on throttle body module

12. Attach engine vent hose

  • To connection on throttle body module

13. Install preheater hoses for throttle body module

14. Connect wiring harness plug for throttle valve adjuster

15. Install intake pipe

  • Attach engine vent hose
  • Connect intake air temperature sensor wiring harness plug

16. Install engine cover.

  • Unscrew oil filler pipe cap
  • Tighten bolts (8 Nm / 6 lbf. ft.)
  • Screw on oil filler pipe cap

17. Check and correct coolant level

  • Note: Top up and bleed cooling system – see operation "Cooling System, Top Up and Bleed".
  • Observe specified coolant quantity

18. Close bonnet


Related Literature Units
-

Throttle Valve Potentiometer > < Engine Z16SE