vauxhall Workshop Repair Guides

Vauxhall Workshop Service and Repair Manuals

Replace injection solenoid valve (Euro 5) > < Replace injection solenoid valve (Euro 4)

Replace multivalve (Euro 5)

Warning:   When working on the LPG system, the multivalve shut-off valve must be closed BY HAND. Work may only be performed by trained personnel. Faulty installation can lead to fire or explosion, which is a danger to life and limb.

Important:   Observe safety regulations for gas-driven vehicles (natural gas / Liquefied Petroleum Gas LPG).

  Remove

1.   Open tailgate
2.   Remove spare wheel cover
3.   Drain gas system
•   Siphon off liquid gas
•   Blow off liquid gas
4.   Detach gas inlet hose from multivalve
•   Unscrew nut (1)
•   Disconnect wiring harness plug
5.   Detach gas outlet hose from multivalve
•   Unscrew bolt (2)
Object Number: 10686642  Size: DEFAULT


6.   Remove multivalve
•   Unscrew 6x bolts (1)
Important:   When removing the multivalve, be careful of the linkage on the tank fill level display.
•   Unscrew multivalve
•   Remove gasket
Object Number: 10686643  Size: DEFAULT


  Install

7.   Install multivalve
•   Tighten 6x screws
Tightening torque 4 Nm
8.   Attach gas outlet hose to multivalve
•   Tighten screw with MKM-6600-1 and MKM-6600-200
Tightening torque 11 Nm
9.   Attach gas inlet hose to multivalve
•   Tighten nuts with MKM-6600-1 and MKM-6600-200
Tightening torque 14 Nm
•   Connect wiring harness plug
10.   Carry out leak test and repair any leaks LUREF_1.gif
11.   Install spare wheel cover
12.   Close tailgate

Replace injection solenoid valve (Euro 5) > < Replace injection solenoid valve (Euro 4)