Remove visco-fan – see operation "Visco-fan, Remove and
Install".
Mark direction of travel of ribbed V-belt.
Remove ribbed V-belts – see operation "Ribbed V-belts,
Remove and Install".
Undo attachment screws (1), (2) and screw plug (3). Remove
damper and shift linkage lever.
Note: In some cases
the bearing pin may unscrew together with the closure bolt. Detach
bearing pin from closure bolt with KM-824-A (4).
Install bearing pin with new seal in timing case with KM-824-A
– tightening torque 65 Nm / 48 lbf. ft.
|