Illustration
1. |
Air intake hoses |
2. |
Resonance pipes switchover valve housing |
3. |
Connection hoses |
4. |
Pre-volume chamber |
5. |
Connecting hose |
6. |
Hot film mass air flowmeter |
7. |
Air intake manifold |
8. |
Air intake manifold |
9. |
Air intake hose |
10. |
Air cleaner housing, lower part |
11. |
Air cleaner housing, upper part |
|
|
Note: Any possible
contamination (grease, oil, etc.) must be cleaned from hoses and
connections prior to assembly.
Strict observance of a torque of 3.5 Nm / 2.6 lbf. ft. must be
ensured when tightening the hose clamps.
Caution
Only if the hose clamps are correctly tightened to the specified
tightening torque, can sealing of the intake system and thereby
operational safety be ensured.
|