Install, Connect
Install intake pipe (above cylinders 1-3-5) - see operation "Intake Pipe (above Cylinders 1-3-5), Remove and Install (X 25 XE)" or "Intake Pipe (above Cylinders 1-3-5), Remove and Install (Y 26 SE)".
Connect coolant connections to heater core and lock.
Top up cooling system - see operations "Cooling System, Top up and Bleed" and "Cooling System, Check for Leaks".