Install, Connect
Attach throttle body to intake manifold with new gasket - tightening torque 9 Nm / 7 lbf. ft.
Connect wiring harness plug to throttle valve potentiometer.
Install coolant hoses and vacuum hose for fuel pressure regulator.
Remove commercially available hose clamps.
Connect Bowden cable bracket to throttle body and Bowden cables to ball head and secure.
Attach fuel return line to fuel pressure regulator - tightening torque 15 Nm / 11 lbf. ft.
Attach Bowden cable bracket and fuel feed line to fuel distributor pipe - tightening torque 15 Nm / 11 lbf. ft.
Notice:
Before assembling components of the intake system (hoses, connections, etc.), they must be cleaned of any possible contamination (grease, oil, etc.). When tightening the hose clamps, be sure to observe exactly the tightening torque of 3.5 Nm / 2.6 lbf. ft.
Important!
It is only ensured that the intake system is free of leaks, thus ensuring operational safety of the engine, if the hose clamps are tightened correctly to the prescribed tightening torque.
Install, Connect
Connect wiring harness plugs to intake air temperature sensor and to hot film mass air flow meter.
Install air filter housing - see illustration "Air Filter Housing, Air Flow Guide".
Top up cooling system - see operations "Cooling System, Top up and Bleed" and "Cooling System, Check for Leaks".