Install, Connect
Attach auxiliary aggregates support to cylinder block - tightening torque for X 16 SZR 35 Nm / 26 lbf. ft., for 16 LZ2 and 20 NEJ 40 Nm / 29.5 lbf. ft.
Attach compressor to auxiliary aggregate support - tightening torque 35 Nm / 26 lbf. ft.
Attach refrigerant lines to compressor with new seal rings - 33 Nm / 24 lbf. ft.
Attach power steering pump to auxiliary aggregates support - tightening torque for X 16 SZR 20 Nm / 15 lbf. ft., for 16 LZ2 and 20 NEJ 25 Nm / 18 lbf. ft.
For 16 LZ2 and 20 NEJ: attach pressure line to auxiliary aggregates support. Install ribbed V-belt - see operation "Ribbed V-belt, Remove and Install".
Charge air conditioning - see operation "Air Conditioning, Evacuate and Charge" in group "D".