vauxhall Workshop Repair Guides

Vauxhall Workshop Service and Repair Manuals

DIS Ignition Module, Remove and Install (X 16 SZR) > < Wiring Harness Routing, Multec Central Fuel Injection

 

Intake Air Pre-heating, Check  

Notice: 

Checking conditions: engine cold (room temperature) and correct condition and seating of the vacuum hoses.  

Object Number: 616191  Size: DEFAULT  Remove, Disconnect   

Remove air cleaner housing upper part, air intake cover and pre-heating hose (1).  

Object Number: 616196  Size: DEFAULT  Inspect   

Check vacuum unit (2) in air filter housing: start engine - valve to hot air duct (3) must remain open up to a temperature of approx. 35 ° C/95 ° F. With engine running, heat air filter housing near valve to approx. 40 ° C/104 ° F (industrial hot air dryer) - valve must now close the hot air duct.  

Check expansion element regulator (4) in air intake cover: allow engine to run and heat expansion element regulator to approx. 40 ° C/104 ° F (industrial hot air dryer) - valve to hot air duct must close.  

Object Number: 2392667  Size: DEFAULT

 

 

Notice: 

Before assembling components of the intake system (hoses, connections, etc.), they must be cleaned of any possible contamination (grease, oil, etc.). When tightening the hose clamps, be sure to observe exactly the tightening torque of 3.5 Nm / 2.6 lbf. ft.  

Object Number: 616201  Size: DEFAULT  Important!   

It is only ensured that the intake system is free of leaks, thus ensuring operational safety of the engine, if the hose clamps are tightened correctly to the prescribed tightening torque.  

Object Number: 616192  Size: DEFAULT  Install, Connect   

Install pre-heating hose, air intake cover and upper part of air filter housing.  

 

 

DIS Ignition Module, Remove and Install (X 16 SZR) > < Wiring Harness Routing, Multec Central Fuel Injection