Removing
- Make
- Volkswagen
- Model
- Beetle A5
- Year
- 2011–2019
- Section
- Adjustment overview › Removing
6-speed manual gearbox 02SRemoving
Removing

Roughly cut out crash tube at ends (1).
Separate original joints of Doppler floor and tunnel reinforcement.

Remove remaining material.
Remove remaining adhesive completely and grind bonded surface back to bare metal.
Build up corrosion protection as per guidelines in Paint workshop manual; Corrosion; Corrosion protection; Attached and welded parts; Materials on bonding surfaces where no welding is to take place.
Then lightly roughen bonding surfaces.
Parts & tools for this job For 2011 Volkswagen Beetle
- PARTClutch kitSearch: Volkswagen Beetle 2011 clutch kit
- TOOLClutch alignment toolSearch: clutch alignment tool
- FLUIDGear oilSearch: Volkswagen Beetle manual gearbox oil
As an Amazon Associate we earn from qualifying purchases.