Workshop Manuals Factory service & repair Volkswagen
01 4-cylinder injection engine (1.4 l direct injection engine, turbocharger and supercharger)02 4-cylinder diesel engine (1.6 l engine, common rail)03 Fuel supply system - Diesel engines04 4-cylinder diesel engine (2.0 l engine, common rail, generation II)05 4-cylinder injection engine (1.8 l, 2.0 l TFSI engine, generation III)06 4-cylinder common rail engine (2.0 l, 4V, turbocharger)07 4-cylinder injection engine (1.2 l engine, 4 V, turbocharger)08 4-cylinder injection engine (1.4 l engine, 4 V, turbocharger)09 4-cylinder injection engine (2.0 l engine, chain drive)10 Fuel supply system - Petrol engines11 4-cylinder injection engine (1.2 l direct injection engine, turbocharger)12 6-speed manual gearbox 0AJ13 5-speed manual gearbox 0A414 6-speed manual gearbox 02Q15 6-speed dual clutch gearbox 02E16 7-speed dual clutch gearbox 0AM17 6-speed automatic gearbox 09G18 6-speed manual gearbox 02S19 Wheels and Tyres Guide20 Brake system21 Running gear, axles, steering22 Heating, air conditioning23 Electrical System, General Information24 Electrical system25 Electrical: Communication26 Vehicle-specifice paint information27 General body repairs, exterior28 General body repairs, interior
Volkswagen Beetle A5 (2011-2019)24 · Electrical system
24 · Electrical

Removing and installing carrier plate for headlights

Make
Volkswagen
Model
Beetle A5
Year
2011–2019
Section
Headlight › Removing and installing carrier plate for headlights
Electrical systemRemoving and installing carrier plate for headlights

Removing and installing carrier plate for headlights

Special tools and workshop equipment requiredTorque wrench V.A.G 1331
W00-0427

The illustrations show removal and installation of the left carrier plate.

The installation position of the headlight may be corrected using the adjustment units of the carrier plate.

Removing

Switch off ignition and all electrical consumers, and remove ignition key.

Remove respective front wheel.

Remove headlight → Chapter.

Unscrew bolt (arrow) on service hatch (1) and remove service hatch (1).

M94-10118

Remove bolts (arrows) from carrier plate (1).

M94-10109

Remove bolt (arrow) from top of carrier plate (1).

M94-10116

Pull carrier plate (1) out towards front.

Installing

Installation is carried out in the reverse order. When installing observe the following:

Install headlight → Chapter.

Check installation position so that shut lines/gaps around headlight are even → Chapter.

If the shut lines/gaps are uneven, the installation position must be corrected → Chapter.

Check functions of headlight.

Checking and adjusting headlight → Chapter.

Specified torques

  • Chapter“Assembly overview - halogen headlight”

Parts & tools for this job For 2011 Volkswagen Beetle

As an Amazon Associate we earn from qualifying purchases.