Workshop Manuals Factory service & repair Volkswagen
01 4-cylinder injection engine (1.4 l direct injection engine, turbocharger and supercharger)02 4-cylinder diesel engine (1.6 l engine, common rail)03 Fuel supply system - Diesel engines04 4-cylinder diesel engine (2.0 l engine, common rail, generation II)05 4-cylinder injection engine (1.8 l, 2.0 l TFSI engine, generation III)06 4-cylinder common rail engine (2.0 l, 4V, turbocharger)07 4-cylinder injection engine (1.2 l engine, 4 V, turbocharger)08 4-cylinder injection engine (1.4 l engine, 4 V, turbocharger)09 4-cylinder injection engine (2.0 l engine, chain drive)10 Fuel supply system - Petrol engines11 4-cylinder injection engine (1.2 l direct injection engine, turbocharger)12 6-speed manual gearbox 0AJ13 5-speed manual gearbox 0A414 6-speed manual gearbox 02Q15 6-speed dual clutch gearbox 02E16 7-speed dual clutch gearbox 0AM17 6-speed automatic gearbox 09G18 6-speed manual gearbox 02S19 Wheels and Tyres Guide20 Brake system21 Running gear, axles, steering22 Heating, air conditioning23 Electrical System, General Information24 Electrical system25 Electrical: Communication26 Vehicle-specifice paint information27 General body repairs, exterior28 General body repairs, interior
Volkswagen Beetle A5 (2011-2019)23 · Electrical System, General Information
23 · Electrical

Results of battery load test

Make
Volkswagen
Model
Beetle A5
Year
2011–2019
Section
Checking battery › Results of battery load test
Electrical System, General InformationResults of battery load test

Results of battery load test

Because of the high load on the battery A during this test, the battery voltage drops.

  • If the battery A is OK, the voltage only drops to the minimum voltage.
  • If the battery A is defective or has a low charge, the battery voltage quickly drops below the minimum voltage.
  • After the test is completed, this low voltage value remains over a longer period, and the voltage increases very slowly again.
  • Only perform test once. Repeating the test falsifies the result.
  • The battery tester with printer VAS 5097 A requires approx. 30 minutes to cool down before carrying out another test or testing another battery A. This ensures that the results are not falsified.

Parts & tools for this job For 2011 Volkswagen Beetle

As an Amazon Associate we earn from qualifying purchases.