Installing engine
- Make
- Volkswagen
- Model
- Caddy Mk3
- Year
- 2004–2015
- Section
- Removing and installing engine › Installing engine
Installing engine
Installation is carried out in the reverse order; note the following:
Warning When doing any repair work, especially in the engine compartment, pay attention to the following due to the cramped conditions:
- Route all the various lines (e.g. for fuel, hydraulics, activated charcoal filter system, coolant and refrigerant, brake fluid and vacuum) and electrical wiring in their original positions.
- To avoid damage to lines, ensure sufficient clearance to all moving or hot components.
Insert new dowel sleeves in cylinder block for centring engine and gearbox.
Hook intermediate plate onto sealing flange and slide onto dowel sleeves (arrows).

Lightly grease input shaft splines with greaseElectronic Parts Catalogue (ETKA).
Check clutch and clutch operating mechanism and install Rep. gr.30.
When installing engine and gearbox assembly, ensure sufficient clearance to subframe and radiator.
Align engine mountings as follows:

- There must be a distance (a) of at least 10 mm between engine support and longitudinal member (right side).
- The side surface of the engine support (2) should be located parallel to the support arm (1).
- Ensure that edges of support arm on gearbox assembly mounting (2) and gearbox support (1) are parallel.

Install pendulum support.
Install right drive shaft and bolt left drive shaft to gearbox Running gear, axles, steeringRep. gr.40Drive shaft; Removing and installing drive shaft.
Install front exhaust pipe → Chapter.
Install selector mechanism, and adjust it if necessary Rep. gr.34Selector mechanism; Removing and installing selector mechanism.
Install slave cylinder of hydraulic clutch Rep. gr.34Selector mechanism; Removing and installing selector mechanism.
Install air conditioner compressor Heating, air conditioningRep. gr.87Air conditioner compressor; Removing and installing air conditioner compressor.
Install poly V-belt → Chapter.
Connect low-pressure line (1) to gas rail.

Note
- First tighten union nut (1) hand-tight then turn 90° (1/4 turn) further, when doing this counterhold on hexagon with a spanner (arrow).
- On no account must the union nut be tightened further than specified, otherwise the special connection will be damaged and the pressure line must be renewed.
To conclude, a gas system test (GAP) must be carried out → Chapter.
If present, install noise insulation General body repairs, exteriorRep. gr.66Noise insulation; Removing and installing noise insulation.
Install plenum chamber bulkhead General body repairs, exteriorRep. gr.50Bulkhead; Removing and installing plenum chamber bulkhead.
Fill coolant system with coolant → Chapter.
Connect battery Electrical systemRep. gr.27Battery; Disconnecting and connecting battery.
Connect Vehicle diagnostic tester.
Read all event memories and clear any event entries that have been created during assembly.
Carry out a road test.
Then carry out a vehicle system test and correct any faults that have been created.
- Chapter“Assembly overview - assembly mountings”
- Chapter“Assembly overview - emission control”
- Drive shafts; Assembly overview - drive shafts Running gear, axles, steeringRep. gr.40Drive shaft; Removing and installing drive shaft
- Noise insulation; Assembly overview - noise insulation General body repairs, exteriorRep. gr.66Noise insulation; Removing and installing noise insulation
Parts & tools for this job For 2004 Volkswagen Caddy
- PARTEngine gasket setSearch: Volkswagen Caddy 2004 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.