Workshop Manuals Factory service & repair Volkswagen
01 4-cylinder diesel engine (1.6 l engine, common rail)02 4-cylinder diesel engine (2.0 l engine, common rail)03 4-cylinder injection engine (1.2 l direct injection engine, turbocharger)04 4-cylinder injection engine (1.6 l engine, BiFuel)05 4-cylinder diesel engine (2.0 l engine, 2 valve)06 4-cylinder injection engine (1.6 l roller rocker finger)07 4-cylinder diesel engine (1.9 l engine)08 4-cylinder injection engine (natural gas)09 4-cylinder diesel engine (2.0 l engine, 2-valve, TDI)10 Fuel supply system - petrol engines11 Fuel supply system - Diesel engines12 Fuel supply system - natural gas engines13 4-cylinder injection engine (1.4 l engine)14 7-speed dual clutch gearbox 0AM15 6-speed dual clutch gearbox 02E16 6-speed manual gearboxes 02Q and 0BB17 Propshaft and rear final drive18 5-speed manual gearbox 0AH19 5-speed manual gearbox 0A420 Running gear: Guide for using trailers21 Wheels and Tyres Guide - General Information22 Running gear: Guide for increasing and decreasing load ratings23 Wheels and Tyres Guide24 Running gear, axles, steering25 Brake systems26 Heating, air conditioning27 Heating and air conditioning: Auxiliary heater28 Electrical System, General Information29 Electrical: Communication30 Electrical system31 General body repairs, interior32 General body repairs, exterior33 Electrical system, 2004»
Volkswagen Caddy Mk3 (2004-2015)25 · Brake systems
25 · Brakes

Work instructions

Make
Volkswagen
Model
Caddy Mk3
Year
2004–2015
Section
Brake lines/brake hoses › Work instructions
Brake systemsWork instructions

Work instructions

Unbolt relevant brake line at brake caliper or wheel brake cylinder; catch escaping brake fluid and dispose of this as per regulations.

Cut through brake line at a suitable point (straight, freely accessible section) with pipe cutter (2).

N47-10058

Remove section to be renewed.

Degrease brake line surface.

Clamp brake line in grip wrench (4) so that approx. 50 mm project out of plastic jaws.

N47-10059

Clamp scraper (3) in a drill and position on brake line.

At slow drill speed and with gentle pressure on brake line, scrape coating off brake line.

Length of scraping is determined by stop in scraper.

Remove scraper from brake line and remove scraping residues.

Remove set of grips and slide pipe bolt (D) onto brake line.

N47-10060

Slide brake line (B) to stop (A) in flanging tool.

N47-10061

Note

  • Brake line must be positioned against stop when the hexagon socket head bolts are tightened, or the flange will not be formed correctly.

Pre-tension brake line in flanging tool until brake line can no longer be moved. Then fold up stop (A) and use angled driver (C) to tighten hexagon socket head bolts in diagonal sequence.

N47-10062

Turn spindle to stop in flanging tool.

N47-10063

Turn spindle back again.

Undo Allen head bolts alternately in diagonal sequence.

Remove brake line from flanging tool. Clean and check brake line and flange.

Briefly flush the section of brake line remaining in the vehicle:

Connect brake filling and bleeding equipment VAS 5234, connect bleeder bottle hose to brake line flange and allow brake filling and bleeding equipment VAS 5234 to run briefly until a little brake fluid has run through.

Blow out new brake line to be inserted with compressed air.

Join brake lines using connector (E).

N47-10065

Install brake line.

Bleed brake system → Chapter.

Parts & tools for this job For 2004 Volkswagen Caddy

As an Amazon Associate we earn from qualifying purchases.