Workshop Manuals Factory service & repair Volkswagen
01 4-cyl. direct injection engine (1.8 l and 2.0 l 4V turbocharger, chain drive)02 4-cylinder injection engine (1.4 l direct injection engine, turbocharger and supercharger)03 Fuel supply system - Diesel engines04 6-cylinder direct-injection engine (3.6 l engine, 4V)05 Fuel supply system - Petrol engines06 4-cylinder common rail engine (2.0 l, EA189 Gen II)07 4-cylinder injection engine (1.4 l direct injection engine, turbocharger)08 4-cylinder common rail engine (2.0 l, 4V, turbo, EA288)09 4-cylinder injection engine (1.8 and 2.0 l engine, chain drive)10 4-cylinder common rail engine (2.0 l, EA189)11 6-cylinder injection engine (direct injection)12 Propshaft and rear final drive13 6-speed automatic gearbox 09M14 7-speed dual clutch gearbox 0AM15 6-speed manual gearbox 02Q, 0BB and 0FB16 6-speed dual clutch gearbox 02E17 6-speed manual gearbox 02S18 6-speed automatic gearbox 09G19 6-speed manual gearbox 02Q20 Wheels and Tyres Guide21 Running gear, axles, steering22 Brake systems23 Wheels and Tyres Guide - Standard24 Heating, air conditioning25 Heating and air conditioning: Supplementary heater26 Electrical: Communication27 Electrical system28 General body repairs, interior29 General body repairs, exterior
Volkswagen Passat CC and CC (2008-2016)02 · 4-cylinder injection engine (1.4 l direct injection engine, turbocharger and supercharger)
02 · Engine

Installing

Make
Volkswagen
Model
CC Passat CC and CC
Year
2008–2016
Section
Cylinder head › Installing
4-cylinder injection engine (1.4 l direct injection engine, turbocharger and supercharger)Installing

Installing

Prerequisite

The pistons must not be positioned at TDC.

Note

  • Do not remove new cylinder head gasket from its packing until immediately before installing.
  • Handle new gasket with extreme care. Damage will cause leakage.
  • The strainer for oil circuit must be installed in cylinder head.

Place clean cloths in cylinders so that no dirt or emery cloth particles can get in between cylinder wall and piston.

Now carefully clean sealing surfaces of cylinder head and cylinder block. Ensure thereby that surfaces are not scored or scratched (if abrasive paper is used, grade must not be less than 100).

Carefully remove metal particles, emery residue and cloths.

Set No. 1 cylinder piston to top dead centre and then turn crankshaft back slightly.

Fit new cylinder head gasket. Inscription (Part No.) must be readable.

Fit cylinder head. When doing this, observe centring pins in cylinder block.

Insert new cylinder head bolts and tighten hand-tight.

Tighten cylinder head bolts in tightening sequence as follows:

V15-0738

Specified torque/ additional specified angle

StageSpecified torque
130 Nm
2Turn 90° further using rigid wrench
3Turn 90° further using rigid wrench
4Turn 90° further using rigid wrench

Install supporting elements in cylinder head and fit respective roller rocker finger onto respective valve stem end or supporting element.

Install camshaft housing.

Removing and installing camshaft housing → Chapter.

Adjust valve timing → Chapter.

Further assembly is basically the reverse of the dismantling sequence.

Parts & tools for this job For 2008 Volkswagen CC

As an Amazon Associate we earn from qualifying purchases.