Workshop Manuals Factory service & repair Volkswagen
01 4-cyl. direct injection engine (1.8 l and 2.0 l 4V turbocharger, chain drive)02 4-cylinder injection engine (1.4 l direct injection engine, turbocharger and supercharger)03 Fuel supply system - Diesel engines04 6-cylinder direct-injection engine (3.6 l engine, 4V)05 Fuel supply system - Petrol engines06 4-cylinder common rail engine (2.0 l, EA189 Gen II)07 4-cylinder injection engine (1.4 l direct injection engine, turbocharger)08 4-cylinder common rail engine (2.0 l, 4V, turbo, EA288)09 4-cylinder injection engine (1.8 and 2.0 l engine, chain drive)10 4-cylinder common rail engine (2.0 l, EA189)11 6-cylinder injection engine (direct injection)12 Propshaft and rear final drive13 6-speed automatic gearbox 09M14 7-speed dual clutch gearbox 0AM15 6-speed manual gearbox 02Q, 0BB and 0FB16 6-speed dual clutch gearbox 02E17 6-speed manual gearbox 02S18 6-speed automatic gearbox 09G19 6-speed manual gearbox 02Q20 Wheels and Tyres Guide21 Running gear, axles, steering22 Brake systems23 Wheels and Tyres Guide - Standard24 Heating, air conditioning25 Heating and air conditioning: Supplementary heater26 Electrical: Communication27 Electrical system28 General body repairs, interior29 General body repairs, exterior
Volkswagen Passat CC and CC (2008-2016)02 · 4-cylinder injection engine (1.4 l direct injection engine, turbocharger and supercharger)
02 · Engine

Assembly overview - turbocharger

Make
Volkswagen
Model
CC Passat CC and CC
Year
2008–2016
Section
Turbocharger › Assembly overview - turbocharger
4-cylinder injection engine (1.4 l direct injection engine, turbocharger and supercharger)Assembly overview - turbocharger

Assembly overview - turbocharger

Note

  • Secure all hose connections with hose clips comparable to production standard
  • Hose connections and hoses for charge air system must be free of oil and grease before assembly. The oil seal and sealing surface must only be oiled lightly for plug-in connectors → Chapter.
  • Charge air system must be free of leaks.
  • Renew self-locking nuts.
  • Spring-type clip pliers VAS 5024A or hose clip pliers VAS 6340 are recommended for installation of spring-type clips.
W00-10380
  • Fill turbocharger with engine oil at oil supply line connection.
  • After installing turbocharger run engine for approx. 1 minute at idling speed, i.e. do not rev engine immediately. This guarantees oil supply to turbocharger.

N21-10224

Part I

N21-10077
  • Charge pressure control solenoid valve N75
  • 10 Nm
  • 7 Nm
  • Turbocharger air recirculation valve N249
    To remove, pressure pipe must be removed Anchor.
  • O-ring
    Renew if damaged.
  • Turbocharger
    Removing and installing → Chapter
    Checking turbocharger vacuum unit → Chapter.
    Removing and installing vacuum unit for turbocharger → Chapter.
    Adjusting vacuum unit for turbocharger → Chapter.
  • Connecting hose
  • Connecting hose

Part II

N21-10240
  • 8 Nm
  • Coolant pipe
  • O-ring
    Renew.
  • Turbocharger
    Specified torque for catalytic converter studs: 20 Nm
    Removing and installing → Chapter
    Checking turbocharger vacuum unit → Chapter.
    Removing and installing vacuum unit for turbocharger → Chapter.
    Adjusting vacuum unit for turbocharger → Chapter.
  • Gasket
    Renew.
  • BracketNoteRetainer is discontinued.The retainer is not reinstalled in cases of repair.
  • BracketNoteRetainer is discontinued.The retainer is not reinstalled in cases of repair.
  • 25 Nm
    Renew studs and fastening nuts.Screw studs into cylinder head until they project only by 25 mm.Observe tightening sequence: items (A) to (I).
  • Coolant pipe
  • Gasket
    Renew.
  • 8 Nm
  • Oil return pipe
  • Seal
    Renew.
  • Banjo bolt, 20 Nm
    Secured to valve timing housing.
  • Oil supply pipeCautionOil supply line must be renewed when installing a new turbocharger.
  • Banjo bolt, 30 Nm

Parts & tools for this job For 2008 Volkswagen CC

As an Amazon Associate we earn from qualifying purchases.