Assembly overview - turbocharger
- Make
- Volkswagen
- Model
- CC Passat CC and CC
- Year
- 2008–2016
- Section
- Turbocharger › Assembly overview - turbocharger
4-cylinder injection engine (1.4 l direct injection engine, turbocharger and supercharger)Assembly overview - turbocharger
Assembly overview - turbocharger
Note
- Secure all hose connections with hose clips comparable to production standard
- Hose connections and hoses for charge air system must be free of oil and grease before assembly. The oil seal and sealing surface must only be oiled lightly for plug-in connectors → Chapter.
- Charge air system must be free of leaks.
- Renew self-locking nuts.
- Spring-type clip pliers VAS 5024A or hose clip pliers VAS 6340 are recommended for installation of spring-type clips.

- Fill turbocharger with engine oil at oil supply line connection.
- After installing turbocharger run engine for approx. 1 minute at idling speed, i.e. do not rev engine immediately. This guarantees oil supply to turbocharger.


- Charge pressure control solenoid valve N75
- 10 Nm
- 7 Nm
- Turbocharger air recirculation valve N249
To remove, pressure pipe must be removed Anchor. - O-ring
Renew if damaged. - Turbocharger
Removing and installing → Chapter
Checking turbocharger vacuum unit → Chapter.
Removing and installing vacuum unit for turbocharger → Chapter.
Adjusting vacuum unit for turbocharger → Chapter. - Connecting hose
- Connecting hose

- 8 Nm
- Coolant pipe
- O-ring
Renew. - Turbocharger
Specified torque for catalytic converter studs: 20 Nm
Removing and installing → Chapter
Checking turbocharger vacuum unit → Chapter.
Removing and installing vacuum unit for turbocharger → Chapter.
Adjusting vacuum unit for turbocharger → Chapter. - Gasket
Renew. - BracketNoteRetainer is discontinued.The retainer is not reinstalled in cases of repair.
- BracketNoteRetainer is discontinued.The retainer is not reinstalled in cases of repair.
- 25 Nm
Renew studs and fastening nuts.Screw studs into cylinder head until they project only by 25 mm.Observe tightening sequence: items (A) to (I). - Coolant pipe
- Gasket
Renew. - 8 Nm
- Oil return pipe
- Seal
Renew. - Banjo bolt, 20 Nm
Secured to valve timing housing. - Oil supply pipeCautionOil supply line must be renewed when installing a new turbocharger.
- Banjo bolt, 30 Nm
Parts & tools for this job For 2008 Volkswagen CC
- PARTEngine gasket setSearch: Volkswagen CC 2008 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.