Part III
- Make
- Volkswagen
- Model
- CC Passat CC and CC
- Year
- 2008–2016
- Section
- Turbocharger › Part III
4-cylinder injection engine (1.8 and 2.0 l engine, chain drive)Part III
Part III

- Seal
Renew - Nut
Tightening sequence → Fig.
Renew
Coat exhaust manifold studs with high temperature paste; high temperature paste ETKA (Electronic Parts Catalogue) - Banjo bolt
38 Nm
To remove and install, the turbocharger must be removed - Seal
Renew - Coolant return line
To remove and install, the turbocharger must be removed - Bolt
9 Nm - Turbocharger
Can only be renewed together with exhaust manifold and vacuum unit as one unit
Removing and installing → Chapter - Bracket
- Bolt
30 Nm
Coat bolt with high temperature paste; high temperature paste ETKA (Electronic Parts Catalogue) - Bolt
30 Nm
Coat bolt with high temperature paste; high temperature paste ETKA (Electronic Parts Catalogue) - Nut
Do not loosen to remove turbocharger
Renew
30 Nm
Coat exhaust manifold studs with high temperature paste; high temperature paste ETKA (Electronic Parts Catalogue) - Fastener

Tighten bolts in the sequence (1 … 5) in 4 stages as follows:
1. Tighten bolts to 5 Nm.
2. Tighten bolts to 12 Nm.
3. Tighten bolts to 16 Nm.
4. Tighten bolts to 25 Nm.
Parts & tools for this job For 2008 Volkswagen CC
- PARTEngine gasket setSearch: Volkswagen CC 2008 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.