Workshop Manuals Factory service & repair Volkswagen
01 4-cyl. direct injection engine (1.8 l and 2.0 l 4V turbocharger, chain drive)02 4-cylinder injection engine (1.4 l direct injection engine, turbocharger and supercharger)03 Fuel supply system - Diesel engines04 6-cylinder direct-injection engine (3.6 l engine, 4V)05 Fuel supply system - Petrol engines06 4-cylinder common rail engine (2.0 l, EA189 Gen II)07 4-cylinder injection engine (1.4 l direct injection engine, turbocharger)08 4-cylinder common rail engine (2.0 l, 4V, turbo, EA288)09 4-cylinder injection engine (1.8 and 2.0 l engine, chain drive)10 4-cylinder common rail engine (2.0 l, EA189)11 6-cylinder injection engine (direct injection)12 Propshaft and rear final drive13 6-speed automatic gearbox 09M14 7-speed dual clutch gearbox 0AM15 6-speed manual gearbox 02Q, 0BB and 0FB16 6-speed dual clutch gearbox 02E17 6-speed manual gearbox 02S18 6-speed automatic gearbox 09G19 6-speed manual gearbox 02Q20 Wheels and Tyres Guide21 Running gear, axles, steering22 Brake systems23 Wheels and Tyres Guide - Standard24 Heating, air conditioning25 Heating and air conditioning: Supplementary heater26 Electrical: Communication27 Electrical system28 General body repairs, interior29 General body repairs, exterior
Volkswagen Passat CC and CC (2008-2016)24 · Heating, air conditioning
24 · Heating & A/C

Removing and installing heat exchanger

Make
Volkswagen
Model
CC Passat CC and CC
Year
2008–2016
Section
Heater unit › Removing and installing heat exchanger
Heating, air conditioningRemoving and installing heat exchanger

Removing and installing heat exchanger

General body repairs, interior

Special tools and workshop equipment requiredDrip tray for workshop hoist VAS 6208
W00-10228
Hose clamps up to 40 mm Ø VAS 3093
W00-0671
Compressed air gun, commercially available

Removing

Place drip tray VAS 6208 beneath engine.

Warning Danger of scalding injuries.
When the engine is warm, the coolant temperature may be above 100° C. The cooling system is pressurised.
If necessary, release pressure and reduce temperature before carrying out repairs.

Clamp off coolant hoses (1) with hose clamps up to 40 mm Ø VAS 3093 and disconnect coolant hoses to heat exchanger.

N80-10016

Push a piece of hose (A) onto upper union of heat exchanger.

Hold a container (B) under lower connection (C).

A87-0675

Using a compressed air gun, carefully blow out coolant from heat exchanger into container (B).

N80-10007

Loosen bolt (6 mm hexagon socket head) (1) on flange between heat exchanger connections slightly (do not completely unscrew).

Note

  • This makes it possible to move the coolant pipes in order to remove heat exchanger.

Remove footwell trim on driver side General body repairs, interiorRep. gr.68Centre console; Assembly overview - centre console.

Remove left footwell vent → Chapter.

Remove bolts (1) (9 ± 1.3 Nm) and (3) (1.5 Nm).

N80-10319

Remove heat exchanger cover (2).

Cover carpet in area under heat exchanger with waterproof foil and water absorbing paper.

Open hose clips (A) (2 Nm) and pull coolant pipes out of heat exchanger.

N80-10128

Take heat exchanger out of heater unit.

Installing

Installation is carried out in the reverse order. When installing, note the following:

A87-0687

Check seals attached to heat exchanger (A) and (B). Only install heat exchanger if seals are undamaged.

Note

  • An improperly bonded seal can roll up when heat exchanger is pushed into heater unit.
  • If seal is damaged or improperly attached, cold air can flow past heat exchanger.

With heat exchanger removed, check heater is not soiled (via heat exchanger shaft (A)).

A87-0688

If necessary, remove dirt or coolant leakage residue from heater unit, e.g. following removal of a leaking heat exchanger.

Slide heat exchanger into heater unit.

Seals (1) must be renewed.

N80-10129

Before installing, moisten seals with coolant.

Note

  • Renew deformed hose clips.

Connect coolant pipes to heat exchanger.

During assembly, hose clips (A) must turn easily on coolant pipes.

N80-10128

Hose clips (A) must be secured as shown in the diagram.

Tighten hose clips (A) to 2.0 Nm.

Check seating of both hose clips (A) after tightening bolts to ensure that they completely encircle the flange on the heat exchanger and the coolant pipe, and do not touch other components.

N80-10007

Tighten bolt (1) of flange between heat exchanger connections to 2 Nm.

Check grommet (C) is seated correctly in plenum chamber bulkhead.

A87-0680

If necessary, seal flanges for coolant pipes to heat exchanger (A) and for expansion valve (to evaporator, only on vehicles with air conditioning system) (B) at apertures in grommet (C) with silicone adhesive sealant to prevent water ingress.

Note

  • Renew seals.
  • Renew deformed hose clips.
  • After renewing heat exchanger, entire coolant must be renewed Rep. gr.19Cooling system, coolant; Draining and filling coolant.
  • Check coolant circuit for leaks. In particular, inspect connections between coolant pipes and heat exchanger.

Parts & tools for this job For 2008 Volkswagen CC

As an Amazon Associate we earn from qualifying purchases.