Removing engine
- Make
- Volkswagen
- Model
- Crafter Mk1
- Year
- 2006–2016
- Section
- Removing and installing engine › Removing engine
Removing engine

- Workshop hoist VAS 6100
- Drip tray for workshop hoist VAS 6208


Note
- The engine is removed forwards together with the gearbox.
- All cable ties that are opened or cut through when the engine is removed must be renewed/replaced in the same position when the engine is installed.
Warning When doing any repair work, especially in the engine compartment, pay attention to the following due to the cramped conditions:
- Route all the various lines (e.g. for fuel, hydraulics, activated charcoal filter system, coolant and refrigerant, brake fluid and vacuum) and electrical wiring in their original positions.
- To avoid damage to lines, ensure sufficient clearance to all moving or hot components.
- The fuel and the fuel lines in the fuel system can become very hot (danger of scalding)!
- The fuel system is also under pressure! Before opening the system, place cloths around the connections. Then carefully loosen connection to release the pressure!
- Wear eye and hand protection when performing any type of repair work on the fuel system!
Before removing, read event memories of all control units Vehicle diagnostic tester.
Perform function “Relieving pressure, gearbox hydraulics”Rep. gr.34.
With the ignition switched off, disconnect battery earth strap Rep. gr.27.
Remove air filter → Chapter.
Remove any noise insulation General body repairs, exteriorRep. gr.50Noise insulation.
Remove bumper Rep. gr.63.
Remove lock carrier Rep. gr.50.
Drain coolant → Chapter.
Remove radiator and charge air cooler.
Remove silencer and exhaust tailpipe (if fitted):
Engine codes BJJ, BJK, BJL, BJM ChapterEngine codes CEBA, CEBB, CECA, CECB ChapterRelease propshaft from gearbox flange Rep. gr.39.
Remove particulate filter → Chapter.
Remove propshaft Rep. gr.39.
Remove selector mechanism from gearbox Rep. gr.34.
Disconnect line to slave cylinder from gearbox Rep. gr.30.
Pull engine wiring harness connector off engine control unit J623.
Disconnect gearbox/body connectors Rep. gr.34.
Remove exhaust gas pressure sensor 1 G450 with bracket Item, hoses remain connected.
Separate connectors between engine wiring harness and body and lay engine wiring harness on engine.
Loosen securing bolts for vane pump belt pulley.
Remove poly V-belt → Chapter.
Remove vane pump and lay it to one side.
Warning To prevent damage to condenser or to refrigerant lines/hoses, ensure that the lines and hoses are not stretched, kinked or bent.
To facilitate removing and installing engine without opening refrigerant circuit:
Release air conditioner compressor from bracket Rep. gr.87.
Secure air conditioner compressor to body so that the refrigerant lines/hoses are not under tension.
Disconnect fuel supply and fuel return lines (arrows) by actuating release buttons.

Separate all connecting, coolant, vacuum and intake hoses from engine.
Disconnect battery positive cable from battery positive terminal and lay cable to side.
Pull off/disconnect all other connectors as necessary from engine, and lay them to one side.
Remove intake manifold flap motor V157Item.
Remove right bracket for air filter Item.
Remove bonnet Rep. gr.55.
Unscrew securing bolts for gearbox (2).

Attach supplement tool 3448 to workshop crane VAS 6100.
Attach supplement tool 3448 to engine as shown.

Warning Stop bolt (arrow) must be tightened.
Unscrew securing bolt for right engine mounting (arrow).

Unscrew securing bolt for left engine mounting (arrow).

Note
- When lifted out, the engine must be carefully guided to prevent damage to the body and steering rack.
Raise engine and pull out forwards.
Securing engine to assembly stand → Chapter.
Parts & tools for this job For 2006 Volkswagen Crafter
- PARTEngine gasket setSearch: Volkswagen Crafter 2006 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.