Workshop Manuals Factory service & repair Volkswagen
01 1-speed gearbox 0CZ02 Running gear, axles, steering03 Wheels and Tyres Guide04 Brake system05 Heating, air conditioning06 Electrical: Communication07 Electrical system08 Electrical: Electric drive09 General body repairs, interior10 General body repairs, exterior11 Vehicle-specific paint information
Volkswagen e-up! (2013-2023)10 · General body repairs, exterior
10 · Body & interior

Installing after renewing A-pillar

Make
Volkswagen
Model
Up! e-up!
Year
2013–2023
Section
Door › Installing after renewing A-pillar
General body repairs, exteriorInstalling after renewing A-pillar

Installing after renewing A-pillar

Note

  • The installation sequence after renewal of A-pillar is for the front left door. Installation of the front right door after renewal of A-pillar is similar.

Warning If A-pillar is renewed, it is essential that bolts on A-pillar are tightened as described in the following.

N57-10492

Carry out following work:

A-pillar has been renewed.Always renew bolts. Loosening it once to adjust door is allowed.

Install in reverse order of removal. To this end, the following should be observed:

Insert front door (1) and tighten bolts (2), (3), (6) and (7). Specified torque: 20 Nm + 90°.

Specified torque for bolts (2): 20 Nm + 90°.

Specified torque for bolts (4): 23 Nm.

Adjust front door → Chapter.

Observe front door gaps Body RepairsRep. gr.00Body panel gaps/shut lines; Body - middle.

Parts & tools for this job For 2013 Volkswagen Up!

As an Amazon Associate we earn from qualifying purchases.