Assembly overview - drive shaft
- Make
- Volkswagen
- Model
- Up! e-up!
- Year
- 2013–2023
- Section
- Drive shaft › Assembly overview - drive shaft
Running gear, axles, steeringAssembly overview - drive shaft
Assembly overview - drive shaft

- Deflector ring
Ensure deflector ring is seated correctly before installing drive shaft Anchor. - Outer constant velocity joint
Renew only as complete unit
Removing Anchor.
Installing: drive onto shaft with plastic hammer until compressed circlip seats
Checking → Chapter - Retaining ring
Insert in groove in shaft - Clamp
Always renew after removing.
Various versions
Allocation Electronic Parts Catalogue “ETKA”
Tightening → Fig. - Boot for constant velocity joint
Check for splits and chafing
Material: Hytrel (polyester elastomer)
Coat sealing surface of constant velocity joint with D 454 300 A2 before installing. - Clamp
Always renew after removing.
Tightening → Fig. - Drive shaft
- Clamp
Always renew after removing.
Tightening → Fig. - Boot for triple roller joint
Check for splits and chafing - Clamp
Always renew after removing.
Tightening → Fig. - Triple roller star with rollersThe chamfer (arrow) points towards drive shaft splines.
- Retaining ring
Always renew after removing. - Joint body
- Retaining ring
Insert in groove in joint body.
Parts & tools for this job For 2013 Volkswagen Up!
- PARTWheel bearingSearch: Volkswagen Up! 2013 wheel bearing
- TOOLBearing puller kitSearch: wheel bearing puller kit
- PARTCV boot kitSearch: Volkswagen Up! 2013 cv boot kit
As an Amazon Associate we earn from qualifying purchases.