Workshop Manuals Factory service & repair Volkswagen
01 4-cylinder common rail engine (2.0 l, EA189 Gen II)02 4-cylinder injection engine (1.8 and 2.0 l engine, chain drive)03 4-cylinder common rail engine (2.0 l, EA189)04 6-cylinder injection engine (direct injection)05 4-cylinder diesel engine (2.0 l engine, 2 valve)06 Fuel supply system - Petrol engines07 Fuel supply system - Diesel engines08 4-cylinder injection engine (2.0 l engine, turbocharger)09 4-cylinder injection engine (1.4 and 1.6 l direct injection)10 4-cylinder injection engine (2.0 l direct injection)11 4-cylinder injection engine (1.6 l engine, direct injection)12 6-cylinder injection engine13 4-cylinder injection engine (1.4 l direct injection engine, turbocharger)14 4-cylinder injection engine (1.4 l direct injection engine, turbocharger and supercharger)15 7-speed dual clutch gearbox 0AM16 6-speed manual gearbox 02Q17 6-speed manual gearbox 02S18 6-speed dual clutch gearbox 02E19 6-speed manual gearbox 0AJ20 Wheels and Tyres Guide - Standard21 Running gear, axles, steering22 Brake systems23 Wheels and Tyres Guide24 Heating, air conditioning25 Heating and air conditioning: Auxiliary heater26 Electrical system up to 12.201027 Electrical: Communication28 Electrical system from 01.201129 General body repairs, interior30 General body repairs, exterior
Volkswagen Eos 1F (2006-2015)30 · General body repairs, exterior
30 · Body & interior

Installing CSC roof

Make
Volkswagen
Model
Eos 1F
Year
2006–2015
Section
CSC roof › Installing CSC roof
General body repairs, exteriorInstalling CSC roof

Installing CSC roof

Note

  • Moving the workshop crane to the vehicle (with the roof attached) and inserting the roof into the vehicle are carried out with the help of at least two additional mechanics.
  • One mechanic on workshop hoist, one mechanic in area of main hinges and at least one additional mechanic at roof side members.
  • Ensure roof does not collide with adjacent components when inserting roof.
  • All bolts are microencapsulated and must always be renewed.

N61-10076

Lower roof (arrow a) into vehicle until roof can be guided, together with roof side member, into latch bearing on windscreen frame (arrow b).

Only now lower rear of roof (arrow c) until main hinges can be guided into mounting pins.

N61-10074

Now insert bolts (2) for main hinge (1), but do not tighten.

N61-10151

Guide the gauge for main bearing VAS 6371 with the stops (1) between the mounting pins (2)(arrow a).

Lower the gauge for main bearing VAS 6371 onto the main hinge (4) and turn pins (3) of gauge until they slip into the mounting holes (arrow b).

Note

  • Oil level in reservoir must be between “min” and “max” marks. Do not fill to “max” mark.

N61-10074

Now tighten bolts (2) for main hinge (1).

Specified torque for bolts: 20 Nm.

Further installation is performed in the reverse order of removal.

Reconnect hydraulic lines.

After reconnecting hydraulic lines, top-up with oil so that the oil level is between the “min” and “max” markings.

Reconnect all disconnected connectors.

Connect water drain hoses.

Fault memory must be read using vehicle diagnostic, testing and information system VAS 5051B to check the electrical components, and must then be erased if necessary.

Open and close roof once complete, using convertible roof actuation button.

After installing roof, perform basic settings → Chapter.

Perform a functional check of roof and side windows after completing basic settings. Adjust side windows if necessary.

Roof is closed.

Check oil level. Top-up with oil so that the oil level is between the “min” and “max” markings.

Parts & tools for this job For 2006 Volkswagen Eos

As an Amazon Associate we earn from qualifying purchases.