Eos (1F7) V6-3.2L (BUB) (2008)
Air Injection Pump: Testing and Inspection
Secondary Air Injection Pump Motor V101, Checking
Special tools, testers and auxiliary items required
‹› Multimeter.
‹› Wiring diagram.
Test requirements
‹› The Secondary Air Injection (AIR) Pump Relay (J299 ) fuses OK.
‹› The Power Supply Relay (terminal 30, B+) (J317) fuse OK.
‹› Battery voltage at least 12.5 V.
‹› All electrical consumers switched off (radiator fan must NOT run during test).
‹› A/C switched off.
‹› The ignition switched off.
Test procedure
-
Perform a preliminary check to verify the customers complaint. Refer to => [ Preliminary Check ] See: Computers and Control Systems/Testing
and Inspection/Scan Tool Testing and Procedures/Preliminary Check
Start diagnosis
-
Disconnect the secondary air injection hose - arrow -.
-
Remove the center noise insulation fasteners - 1, 2, 3 - and the center noise insulation panel.