Eurovan L5-2369cc 2.4L DSL SOHC (AAB) Can (1993)
-
Lock injection pump sprocket using 2064 pin
-
Mark direction of rotation on toothed belt
-
Hold injection pump drive sprocket using 3036 counter-hold tool
-
Remove mounting bolt then remove drive sprocket/toothed belt
-
Remove vibration damper center bolt
-
Remove 4 x M8 crankshaft vibration damper/toothed belt pulley mounting bolts
-
Remove vibration damper
-
Relieve toothed belt tension (loosen coolant pump)
-
Remove lower toothed belt guard
-
Mark direction of rotation on toothed belt
-
Remove toothed belts
Installing, tensioning:
-
Ensure that flywheel TDC mark and reference mark are aligned
-
Lock camshaft in place using 2065 A setting bar
-
Centralize setting bar as follows:
-
Turn camshaft so one end of setting bar contacts cylinder head
-
Using feeler gauge establish gap at other end of setting bar
-
Place feeler gauge (corresponding to half the gap) between setting bar and cylinder head
-
Turn camshaft until setting bar contacts feeler gauge
-
Place 2nd feeler gauge, of same thickness, at other end between setting bar and cylinder head
-
Loosen camshaft sprocket mounting bolt a half turn
-
Release camshaft sprocket from camshaft taper by tapping with a hammer (using a drift through rear toothed belt guard opening)
-
Fit toothed belt for camshaft drive
^
Note direction of rotation for used belts