Installation
- Make
- Volkswagen
- Model
- Fox 5Z, Europe
- Year
- 2005–2011
- Section
- Refrigerant circuit - assembly overview › Installation
Heating, air conditioningInstallation
Installation
Installation is performed in reverse sequence to the removal, observing the following:
Observe the fastening screw tightening sequence:
- Engines 1.0L (BNX, CCNA) and 1.6L (BPA, CCRA, CFZA) → Chapter
- Engines 1.0L (AQZ, BJE, BNX) and 1.6L (BAH, BJA, BPA) → Chapter
- Engine 1.4L (BKR) → Chapter
- Engine 1.2L (BMD). Chapter
- Engine 1.4L (BNM) → Chapter
Remove the refrigerant hoses (1) and (2).

Screw on the fastening screws (arrows) with torque of (22 Nm).
Parts & tools for this job For 2005 Volkswagen Fox
- TOOLA/C manifold gauge setSearch: AC manifold gauge set
- TOOLUV leak detection kitSearch: AC UV leak detection kit
- PARTCabin filterSearch: Volkswagen Fox 2005 cabin filter
As an Amazon Associate we earn from qualifying purchases.